Before the first guest
(Services) 03 / 03Renovations, Ready to let(Fig. A) Before the first guest

Projects
Sharing, conversions, refits
Best for
Spaces not ready yet
Starts with
A survey and a plan
Ends with
A home ready to let

We design functional spaces that make a home ready to share with guests, whether you are there or away. Underused rooms and buildings become bright, private spaces guests love. Licensing and planning shape every project from the first sketch, so the finished home meets the rules in full.

(01) Two kinds of projectChoose a project to see the plan change01 / 06

Two starting points, both drawn for guests.

Every project is different, but each one is drawn around guests, upkeep and licensing from the first sketch.

GARDENDRIVESIDE PATHFWDHallKitchen and family60.8 m²Living26.0 m²WCUtilityStudyDouble garage38.6 m²Garage doorFront door19.0 m0123mN
BeforeA family home with a double garage
GARDENDRIVESIDE PATHFWDWDPatioShared gardenHallKitchen and family60.8 m²Living26.0 m²WCUtilityGuest utilityBedroom12.2 m²En suiteSitting room19.6 m²Shared front door19.0 m0123mN
AfterThe garage, now private guest rooms
Project 01 / 02

One home, with private rooms for guests.

Most family homes have space that rarely earns its keep, like a double garage full of boxes or a study nobody works in. Here it becomes a bright bedroom with its own shower room, a sitting room with a place to work and a utility room, all reached through the main front door. The old rear window becomes French doors onto the garden, so guests wake up to the patio, while the rest of the home carries on exactly as before.

Existing wallsNew wallsGuest roomsNew door

Illustrative plans, not to scale. Every project depends on the approvals it needs, and nothing on this page is legal or planning advice.

(02) Order of worksRules first, then design02 / 06

In the right order.

The most expensive mistakes happen when work starts before the rules are checked. We start with the rules.

01

Survey the space

A measured survey of the space, its condition, heating, drainage and power, and what the building will allow.

02
Key step

Check the rules

Everything the space needs checked with the council before a single line is drawn.

03

Design for guests

Layout, privacy, sound, storage and finishes chosen for short stays and easy cleaning, then agreed with you.

04

Build and fit out

Trusted trades on one programme, with one point of contact and progress shared with you every week.

05

Make it safe

Alarms, fire doors, safety checks and certificates built in and recorded before guests arrive.

06

Style and launch

Furnished, photographed and listed, with everything in place before the first guest arrives.

A bright, newly finished open-plan home
A bright, newly finished open-plan homeReady before the first guest.
(03) Designed to be sharedWhat we design in03 / 06

Made for short stays.

01

Durable finishes

Surfaces chosen to look good after the hundredth stay.

02

Lockable owner storage

Your things kept private, without a spare room.

03

Quiet between rooms

Thought given to sound where people share.

04

A linen flow

Space to store, swap and launder without fuss.

05

Smart entry

Arrivals that do not depend on a handover.

06

Rest built in

Blackout blinds, good mattresses and calm, quiet bedrooms.

07

Space to unpack

Wardrobes, drawers and a place for every suitcase.

08

Somewhere to work

A proper desk, good light and fast, reliable wifi.

09

Fire safety built in

Alarms, fire doors and escape routes planned from the start.

(04) The rulesBuilding standards04 / 06

Checked before the first wall moves.

In the guidance
If the building work you're doing needs a building warrant, you must get one before you start.
mygov.scot, building warrants2
Worth knowing

The whole of Edinburgh is a short-term let control area. Letting a home that is not your main home needs planning permission, and flats on a shared stair are very unlikely to be approved. Letting rooms in your own home, or the whole home while you are away, does not normally need it. We check what applies before any work starts.1

(05) Responsible by designGood for guests, neighbours and owners05 / 06
Responsible short letting

It is about finding the balance.

Short letting should be a good experience for visitors, neighbours and owners alike. Every space we prepare is designed to be licensed first, comfortable for guests and considerate of the building and the street.

Talk to us about your project →
  1. 01

    Rules first

    Everything the building needs checked before any design work.

  2. 02

    Safety built in

    Alarms, fire safety and certificates designed in, not added at the end.

  3. 03

    Neighbour conscious

    Sound, entrances and bins planned with the building and the street in mind.

  4. 04

    Made to last

    Durable finishes that still look good after the hundredth stay.

  5. 05

    Space back in use

    Underused spaces made into homes where the building allows.

(06) Managed by usFrom finished works to first guest, and beyond06 / 06

Built for guests. Run by us.

Optional, and recommended

Your time is better spent elsewhere.

A finished home is only the start. Running a short-term let properly, and getting the most from it, still takes time and attention every single week, even when you live in it or right next door. Go hands free: we run the whole thing, end to end, and you simply collect the monthly payments.

See full management →
  1. 01

    Pricing and bookings

    Rates set and adjusted through the year, and every enquiry answered.

  2. 02

    Guests looked after

    Check-ins, questions and reviews, handled day and night.

  3. 03

    Cleaning and upkeep

    The home turned around and kept ready between every stay.

  4. 04

    Licence and compliance

    Every condition and certificate tracked and renewed on time.

  5. 05

    One monthly payment

    A clear statement, and your income paid to you each month.

(In their words)Owners we look after01 / 05

Owners, in their own words.

“A leak came through from the flat upstairs mid-stay. Hame sorted the neighbour and the repair, and the guests carried on as if nothing had happened. I only heard about it once it was fixed.”
BrettMarchmont, EdinburghLong let + summer short letGoogle review
Before the first guest
(Services) 03 / 03Renovations, Ready to let(Fig. A) Before the first guest

Projects
Sharing, conversions, refits
Best for
Spaces not ready yet
Starts with
A survey and a plan
Ends with
A home ready to let

We design functional spaces that make a home ready to share with guests, whether you are there or away. Underused rooms and buildings become bright, private spaces guests love. Licensing and planning shape every project from the first sketch, so the finished home meets the rules in full.

(01) Two kinds of projectChoose a project to see the plan change01 / 06

Two starting points, both drawn for guests.

Every project is different, but each one is drawn around guests, upkeep and licensing from the first sketch.

GARDENDRIVESIDE PATHFWDHallKitchen and family60.8 m²Living26.0 m²WCUtilityStudyDouble garage38.6 m²Garage doorFront door19.0 m0123mN
BeforeA family home with a double garage
GARDENDRIVESIDE PATHFWDWDPatioShared gardenHallKitchen and family60.8 m²Living26.0 m²WCUtilityGuest utilityBedroom12.2 m²En suiteSitting room19.6 m²Shared front door19.0 m0123mN
AfterThe garage, now private guest rooms
Project 01 / 02

One home, with private rooms for guests.

Most family homes have space that rarely earns its keep, like a double garage full of boxes or a study nobody works in. Here it becomes a bright bedroom with its own shower room, a sitting room with a place to work and a utility room, all reached through the main front door. The old rear window becomes French doors onto the garden, so guests wake up to the patio, while the rest of the home carries on exactly as before.

Existing wallsNew wallsGuest roomsNew door

Illustrative plans, not to scale. Every project depends on the approvals it needs, and nothing on this page is legal or planning advice.

(02) Order of worksRules first, then design02 / 06

In the right order.

The most expensive mistakes happen when work starts before the rules are checked. We start with the rules.

01

Survey the space

A measured survey of the space, its condition, heating, drainage and power, and what the building will allow.

02
Key step

Check the rules

Everything the space needs checked with the council before a single line is drawn.

03

Design for guests

Layout, privacy, sound, storage and finishes chosen for short stays and easy cleaning, then agreed with you.

04

Build and fit out

Trusted trades on one programme, with one point of contact and progress shared with you every week.

05

Make it safe

Alarms, fire doors, safety checks and certificates built in and recorded before guests arrive.

06

Style and launch

Furnished, photographed and listed, with everything in place before the first guest arrives.

A bright, newly finished open-plan home
A bright, newly finished open-plan homeReady before the first guest.
(03) Designed to be sharedWhat we design in03 / 06

Made for short stays.

01

Durable finishes

Surfaces chosen to look good after the hundredth stay.

02

Lockable owner storage

Your things kept private, without a spare room.

03

Quiet between rooms

Thought given to sound where people share.

04

A linen flow

Space to store, swap and launder without fuss.

05

Smart entry

Arrivals that do not depend on a handover.

06

Rest built in

Blackout blinds, good mattresses and calm, quiet bedrooms.

07

Space to unpack

Wardrobes, drawers and a place for every suitcase.

08

Somewhere to work

A proper desk, good light and fast, reliable wifi.

09

Fire safety built in

Alarms, fire doors and escape routes planned from the start.

(04) The rulesBuilding standards04 / 06

Checked before the first wall moves.

In the guidance
If the building work you're doing needs a building warrant, you must get one before you start.
mygov.scot, building warrants2
Worth knowing

The whole of Edinburgh is a short-term let control area. Letting a home that is not your main home needs planning permission, and flats on a shared stair are very unlikely to be approved. Letting rooms in your own home, or the whole home while you are away, does not normally need it. We check what applies before any work starts.1

(05) Responsible by designGood for guests, neighbours and owners05 / 06
Responsible short letting

It is about finding the balance.

Short letting should be a good experience for visitors, neighbours and owners alike. Every space we prepare is designed to be licensed first, comfortable for guests and considerate of the building and the street.

Talk to us about your project →
  1. 01

    Rules first

    Everything the building needs checked before any design work.

  2. 02

    Safety built in

    Alarms, fire safety and certificates designed in, not added at the end.

  3. 03

    Neighbour conscious

    Sound, entrances and bins planned with the building and the street in mind.

  4. 04

    Made to last

    Durable finishes that still look good after the hundredth stay.

  5. 05

    Space back in use

    Underused spaces made into homes where the building allows.

(06) Managed by usFrom finished works to first guest, and beyond06 / 06

Built for guests. Run by us.

Optional, and recommended

Your time is better spent elsewhere.

A finished home is only the start. Running a short-term let properly, and getting the most from it, still takes time and attention every single week, even when you live in it or right next door. Go hands free: we run the whole thing, end to end, and you simply collect the monthly payments.

See full management →
  1. 01

    Pricing and bookings

    Rates set and adjusted through the year, and every enquiry answered.

  2. 02

    Guests looked after

    Check-ins, questions and reviews, handled day and night.

  3. 03

    Cleaning and upkeep

    The home turned around and kept ready between every stay.

  4. 04

    Licence and compliance

    Every condition and certificate tracked and renewed on time.

  5. 05

    One monthly payment

    A clear statement, and your income paid to you each month.

(In their words)Owners we look after01 / 05

Owners, in their own words.

“A leak came through from the flat upstairs mid-stay. Hame sorted the neighbour and the repair, and the guests carried on as if nothing had happened. I only heard about it once it was fixed.”
BrettMarchmont, EdinburghLong let + summer short letGoogle review
Before the first guest
(Services) 03 / 03Renovations, Ready to let(Fig. A) Before the first guest

Projects
Sharing, conversions, refits
Best for
Spaces not ready yet
Starts with
A survey and a plan
Ends with
A home ready to let

We design functional spaces that make a home ready to share with guests, whether you are there or away. Underused rooms and buildings become bright, private spaces guests love. Licensing and planning shape every project from the first sketch, so the finished home meets the rules in full.

(01) Two kinds of projectChoose a project to see the plan change01 / 06

Two starting points, both drawn for guests.

Every project is different, but each one is drawn around guests, upkeep and licensing from the first sketch.

GARDENDRIVESIDE PATHFWDHallKitchen and family60.8 m²Living26.0 m²WCUtilityStudyDouble garage38.6 m²Garage doorFront door19.0 m0123mN
BeforeA family home with a double garage
GARDENDRIVESIDE PATHFWDWDPatioShared gardenHallKitchen and family60.8 m²Living26.0 m²WCUtilityGuest utilityBedroom12.2 m²En suiteSitting room19.6 m²Shared front door19.0 m0123mN
AfterThe garage, now private guest rooms
Project 01 / 02

One home, with private rooms for guests.

Most family homes have space that rarely earns its keep, like a double garage full of boxes or a study nobody works in. Here it becomes a bright bedroom with its own shower room, a sitting room with a place to work and a utility room, all reached through the main front door. The old rear window becomes French doors onto the garden, so guests wake up to the patio, while the rest of the home carries on exactly as before.

Existing wallsNew wallsGuest roomsNew door

Illustrative plans, not to scale. Every project depends on the approvals it needs, and nothing on this page is legal or planning advice.

(02) Order of worksRules first, then design02 / 06

In the right order.

The most expensive mistakes happen when work starts before the rules are checked. We start with the rules.

01

Survey the space

A measured survey of the space, its condition, heating, drainage and power, and what the building will allow.

02
Key step

Check the rules

Everything the space needs checked with the council before a single line is drawn.

03

Design for guests

Layout, privacy, sound, storage and finishes chosen for short stays and easy cleaning, then agreed with you.

04

Build and fit out

Trusted trades on one programme, with one point of contact and progress shared with you every week.

05

Make it safe

Alarms, fire doors, safety checks and certificates built in and recorded before guests arrive.

06

Style and launch

Furnished, photographed and listed, with everything in place before the first guest arrives.

A bright, newly finished open-plan home
A bright, newly finished open-plan homeReady before the first guest.
(03) Designed to be sharedWhat we design in03 / 06

Made for short stays.

01

Durable finishes

Surfaces chosen to look good after the hundredth stay.

02

Lockable owner storage

Your things kept private, without a spare room.

03

Quiet between rooms

Thought given to sound where people share.

04

A linen flow

Space to store, swap and launder without fuss.

05

Smart entry

Arrivals that do not depend on a handover.

06

Rest built in

Blackout blinds, good mattresses and calm, quiet bedrooms.

07

Space to unpack

Wardrobes, drawers and a place for every suitcase.

08

Somewhere to work

A proper desk, good light and fast, reliable wifi.

09

Fire safety built in

Alarms, fire doors and escape routes planned from the start.

(04) The rulesBuilding standards04 / 06

Checked before the first wall moves.

In the guidance
If the building work you're doing needs a building warrant, you must get one before you start.
mygov.scot, building warrants2
Worth knowing

The whole of Edinburgh is a short-term let control area. Letting a home that is not your main home needs planning permission, and flats on a shared stair are very unlikely to be approved. Letting rooms in your own home, or the whole home while you are away, does not normally need it. We check what applies before any work starts.1

(05) Responsible by designGood for guests, neighbours and owners05 / 06
Responsible short letting

It is about finding the balance.

Short letting should be a good experience for visitors, neighbours and owners alike. Every space we prepare is designed to be licensed first, comfortable for guests and considerate of the building and the street.

Talk to us about your project →
  1. 01

    Rules first

    Everything the building needs checked before any design work.

  2. 02

    Safety built in

    Alarms, fire safety and certificates designed in, not added at the end.

  3. 03

    Neighbour conscious

    Sound, entrances and bins planned with the building and the street in mind.

  4. 04

    Made to last

    Durable finishes that still look good after the hundredth stay.

  5. 05

    Space back in use

    Underused spaces made into homes where the building allows.

(06) Managed by usFrom finished works to first guest, and beyond06 / 06

Built for guests. Run by us.

Optional, and recommended

Your time is better spent elsewhere.

A finished home is only the start. Running a short-term let properly, and getting the most from it, still takes time and attention every single week, even when you live in it or right next door. Go hands free: we run the whole thing, end to end, and you simply collect the monthly payments.

See full management →
  1. 01

    Pricing and bookings

    Rates set and adjusted through the year, and every enquiry answered.

  2. 02

    Guests looked after

    Check-ins, questions and reviews, handled day and night.

  3. 03

    Cleaning and upkeep

    The home turned around and kept ready between every stay.

  4. 04

    Licence and compliance

    Every condition and certificate tracked and renewed on time.

  5. 05

    One monthly payment

    A clear statement, and your income paid to you each month.

(In their words)Owners we look after01 / 05

Owners, in their own words.

“A leak came through from the flat upstairs mid-stay. Hame sorted the neighbour and the repair, and the guests carried on as if nothing had happened. I only heard about it once it was fixed.”
BrettMarchmont, EdinburghLong let + summer short letGoogle review